Research
Infrastructure
Astrophysikalisches
Institut Potsdam

Since
the "Schwarzschildhaus", a new building for research and technology, went
into operation in March 2000, the AIP has an excellent position for the
development of ground-based large aperture telescopes, focal plane instrumentation,
and observatories in space. Current projects include the AGW units for
the Large Binocular Telescope, the 3D spectrograph PMAS, and the robotic
telescope STELLA. Among projects at the planning stage or in the process
or preparation, there are the spectropolarimeter PEPSI, the astrometry
satellite DIVA, the solar telescope GREGOR, and a possible participation
in 2nd Generation VLT instrumentation.
The
Schwarzschildhaus offers, along with a suite of offices for scientists
in the first floor, a modern mechanical workshop with state-of-the art
machines, including an assembly hall and storage space, an office for mechanical
design with 3 CAD workstations, an electronics lab consisting of 3 rooms,
a detector lab, a class-4 clean room, an optical lab with 3 separate rooms
which can be combined to form a single large laboratory, a faraday cage
for the testing of optical and IR detector systems, the computer center
for supercomputers and central network services, and associated rooms for
support, operations, and archiving.
The
following gallery provides an overview of the facilities available for
R&D projects at AIP. Click on images to obtain full resolution.
|
|
|
|
| Mechanical Workshop |
IXION CNC Machine |
Deckel CNC Machine |
CNC Lathe |
| |
|
|
|
|
| CAD 1 |
CAD 2 |
3D CAD design ... |
... real component |
| |
|
|
|
|
| Electronics Lab 1 |
Electronics Lab 2 |
Electronics Lab 3 |
Electronics Lab 4 |
| |
|
|
|
|
| Optics Lab |
Precision Optics |
Optical Fibers 1 |
Optical Fibers 2 |
| |
|
|
|
|
| Clean Room |
CCD Detector Head |
Detector Lab |
Photometric Testbench |
| |
|
|
|
|
| Integration Hall 1 |
Integration Hall 2 |
Integration Hall 3 |
Integration Hall 4 |
| |
page
created by mmr
comments: mmroth@aip.de